Place of Origin: | China |
Brand Name: | Torich |
Certification: | IS09001 ISO14001 TS16949 |
Model Number: | SA192 |
Minimum Order Quantity: | 8 tons or 5 tons |
---|---|
Price: | Negotiation |
Packaging Details: | In bundles |
Delivery Time: | 5-8 weeks days |
Payment Terms: | L/C, T/T |
Supply Ability: | 5000tons per year |
Material: | 1010 1020 1045 4130 Etc | Shape: | Special Shaped |
---|---|---|---|
Length: | 5-6m | End: | Plain |
Spiralgated Temperature Pressure Internally Multi-Lead Rifled Rifled Tube (Internally Ribbed Tube) Multi-Rifled Tubes
Quick detail:
Material: 1020 1045 1010 4130,4140 etc
Application:Boiler ,Drill tubes
Size : as per customer’ requestes
Carbon steel tubes shaped tubes for boiler application.
Torich Internally Multi-Lead Rifled Rifled Tube ,made by cold worked.
Raw material is from big steel mill like Bao Steel, ZhongTian, Shagang etc ,Tubes with several times cold worked.which has stable Mechanical properties on final product.Quick delivery time,high precisous, good surface .
All win a good feedbacks from our customers.
Welcome to send us your drawing .
Torich Strength:
1. Torich is the STEEL TUBE MAKER company in China,playing a significant role in domestic market as well as international market.
2. Our products have exported to over 56 countries worldwide, winning a great fame among our customers.
3. There was no quality claim in the past 3 years.
4. First production was started since 1997, our boss worked in steel tube industry for over 10 years before started the own factory, factory engineers with over 30 years manufacturing experience, knowing well about production and inspection technology.
5. We have been exporting steel tubes since 10 years ago, and know well about international standard for steel tubes DIN/EN,ASTM,SAE,BS,GOST,JIS etc,also with great experience of International trading practices.
6. Our team take Timely action within 24 hours after receiving customers' first requirement and enquiry.
7. 100% prompt delivery in the past 3 years.
8. 100% dimensional check and 100% visual inspection on tube surfaces.
9. 100% eddy current test and ultrasonic test for detecting longitudinal and transversal defects.
10.Convenient tranportation: production location is 30 mins high speed train from Shanghai, 2 hours drive from Shanghai