Home ProductsWelded Precision Steel Tubes

Super Heater ERW Boiler Steel Tube SA178 Grade A Grade C Carbon

Super Heater ERW Boiler Steel Tube SA178 Grade A Grade C Carbon

    • Super Heater ERW Boiler Steel Tube SA178 Grade A Grade C Carbon
    • Super Heater ERW Boiler Steel Tube SA178 Grade A Grade C Carbon
    • Super Heater ERW Boiler Steel Tube SA178 Grade A Grade C Carbon
    • Super Heater ERW Boiler Steel Tube SA178 Grade A Grade C Carbon
  • Super Heater ERW Boiler Steel Tube SA178 Grade A Grade C Carbon

    Product Details:

    Place of Origin: China
    Brand Name: Torich
    Certification: ISO 9001 ISO14001
    Model Number: A178/A178M

    Payment & Shipping Terms:

    Minimum Order Quantity: 8tons
    Price: 1100-1300USD/ton
    Packaging Details: In woven bags packaging.
    Delivery Time: 5-8week days
    Payment Terms: L/C, T/T
    Supply Ability: 5000tons/year
    Contact Now
    Detailed Product Description
    Standard: A178/A178M Certificate: ISO9001 TS16949
    Length: 12m Max Production Method: ERW
    Heat Treatment: Yes Steel Grade: Grade A, Grade C, Grade D
    Key Words: ERW Bolier Tubes

    Super Heater ERW SA178 Grade A Grade C Carbon Boiler Steel Tube

     

    1. Details:

    Standard SA178
    OD 12.7-127mm
    WT 0.9-9mm
    Length 4-12m, or according to customer required
    Fixed length or random length
    Material Grade A, Grade C, Grade D, all belongs to carbon tube
    Production method ERW (Electric Resistance Welded)
    Heat treatment Annealed, normalized, stress relieved
    Key words ERW steel tube, steel pipes carbon, welded steel tube, boiler steel tubes,

     

    Surface Quality:The internal and external surfaces of the steel tube are not allowed to have cracks, scabs, folds, delaminations, laps, and burns. Allows for scribes, scratches, misalignment of welds, burns, oxide scales, and external burr removal traces that are not more than a negative wall thickness deviation

     

    Inspection items:

    chemical composition

    Tensile test

    Ultrasonic examination

    Eddy current flaw detection

    Bending test

    Flattening test

     

    Heat treatment: After welding, all tubes shall be heat treated at a temperature of 900℃ or higher and followed by cooling in air or in the cooling chamber of a controlled- atmoshpere furnace. Cold-drawn tubes shall be heat treated after the final cold -draw pass at a temperature of 650℃ or higher.

     

    Product marking: The manufacturer's name or symbol may be placed permanently on each tube by rolling or light stamping before normalizing. If a single stamp is placed on the tube by hand, this mark should be not less than 8 in[200mm] from one end of the tube.

     

    2. Showing:

    Super Heater ERW Boiler Steel Tube SA178 Grade A Grade C Carbon 0Super Heater ERW Boiler Steel Tube SA178 Grade A Grade C Carbon 1

     
    QUALITY CONTROL:
    1. Incoming Raw Material Inspection
    2. Raw Material Segregation to avoid steel grade mix-up
    3. Heating and Hammering End for Cold Drawing
    4. Cold Drawing and Cold Rolling, on line inspection
    5. Heat Treatment, +A, +SRA, +LC, +N, Q+T
    6. Straightening-Cutting to specified length-Finished Measuring Inspection
    7. Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
    8. Packing and Stocking

     

    RFQ:

    What is your Guarantee?
    1.SO9001:2008 and TS16949 certificate SGS, BV, TUV or other third party inspection is available.
    2.High quality with competitive price.
    3.Advanced technology, experienced engineer, ISO quality system for quality assurance and traceability.

    Do you have agent or distributor in our country?
    1.We are recruiting area agent and distributor all over the world, welcome to send us your mail or call us for detail discussion.


    How is your production capability?
    1.2000 tons monthly production capacity, 5000 tons monthly trading capability
    2.Prompt and Timely shipment

    How to get the sample?
    1.You are requested to pay for sample charges and courier charges from China to your country; and the free sample is according the product like size, steel grade and quantity, please consult our sales for details
    2.Sample charges will be refunded when order is placed.

    What is your Payment Term?
    1.T/T: 30% deposit in advance, the balance 70% paid before shipment
    2.30% down payment, the balance 70% paid against L/C at sight
    3.Upon negotiation

    Who are your customers?
    1.Stockists, Distributors,Wholesalors,Agents, Traders, End Users, etc


    How long will you react on our requirement?
    1.Your requirement would be treated within 24 hours on weekdays. Quotations would be sent upon technical details confirmed by customer!

    Any more questions about your doubts, please feel free to send us your emails or call!

    Contact Details
    Torich International Limited

    Contact Person: Mr. Richard

    Tel: 86-574-88086983

    Fax: 86-574-88086983

    Send your inquiry directly to us (0 / 3000)